How long will hoover dam last
How far is the Grand Canyon from Las Vegas? Why is extra water harmful to fresh concrete? The water-cement ratio is important to maintain the concrete quality. When more amount of water is added to the fresh concrete, it will affect the workability of the mix.
Extra water reduces the chance of producing a perfect concrete gel and thus it is meant to be harmful for fresh concrete. How many workers died building the Eiffel Tower? Like the Chrysler Building, which had 3, workers and zero deaths, the Eiffel Tower kept its construction worker death toll down to one worker with much credit going to extensive use of guard rails and safety screens.
Will Lake Mead run out of water? Currently, Lake Mead is at an elevation of feet or percent full. Is the cement in the Hoover Dam still curing? Has anyone fallen off Hoover Dam? Tragedy at new Hoover Dam bridge: First suicide reported.
How long did Lake Mead take to fill? Lake Mead began filling in late and the average daily surface elevations from 1 February , when elevation data began to be collected, through are shown in Figure 2. The reservoir did not reach 1, ft above msl, the elevation of the upper outlet, until 1 May What happens if Lake Mead dries? The towering foot Vajont Dam in Italy was responsible for approximately 2, dead in a accident — but the structure itself suffered only minor damage.
A huge rockfall into the reservoir sent an enormous splash of water over the top in a wave more than 80 stories high, sweeping downstream and wiping out several villages.
Still, the mother of all accidents in terms of scale and destruction was surely the failure of the Banqiao Dam in China capacity million cubic meters , which was just one of 62 dams destroyed some intentionally in a concatenating horror show, the result of record-breaking rains, that left millions homeless and more than 25, dead.
Cookie banner We use cookies and other tracking technologies to improve your browsing experience on our site, show personalized content and targeted ads, analyze site traffic, and understand where our audiences come from.
By choosing I Accept , you consent to our use of cookies and other tracking technologies. The Straight Dope homepage. Filed under:.
How long are dams like Hoover Dam engineered to last? By Cecil Adams Aug 11, Reddit Pocket Flipboard Email. Dear Cecil: How long are these huge dams, like the Hoover Dam, engineered to last? Craig S. Anecdotal story: This summer I was out at a Dam spillway installing some of my systems and got talking with the operator out there. To him, at least, and I'd agree from his comments, business got too involved with engineering. They started running too many cost estimates and too many lowest-bidder contracts instead of building things for a century plus lifetime.
Shame to see that. I hope that our engineers continue to fight for proper surveys and designs rather than a race to the bottom. It was a tremendously unsafe worksite. The environmental impact of the project was barely considered. I think all things considered we've made good progress. On a relative scale the number of accidents building the Hoover dam was high but not spectacularly high when compared to the number of people dying in high-rise construction and road building.
The Hoover Dam hasn't even properly set yet! Curing is an exponentially decreasing process, there will always be a little bit more concrete that still needs to cure, much like radioactivity half-life.
The Hoover Dam is quite an interesting piece of civil engineering, it broke ground in many ways other than the physical one. Concrete, while on the surface very boring is actually a super interesting engineering material.
Another interesting tidbit: for the longest time the dam was actively cooled to whisk away the heat from the curing concrete concrete curing is an exothermic process.
The threat posed by small dams and their short designed life expectancy was demonstrated in dramatic fashion earlier this year. The historic flooding that impacted South Carolina's midlands earlier this year was driven by a cascade of dam failures.
Everyone saw the pictures of Columbia, SC but that flooding was mostly due to "normal" causes. The city's drainage system was overwhelmed by rainfall that exceeded historic levels by several orders of magnitude higher than even a 1, year storm and the Broad river consequently overflowing its banks.
However, that wasn't the only place impacted by the storm. South Carolina has an enormous number of small earthen dams, built on private land with the land owner responsible for maintenance. Obviously, these dams were not built to handle such a storm but even if they were, the lack of oversight led to a lack of maintenance, worsening their chances of surviving the initial floods. As upstream dams broke, downstream dams were subjected to massive surges, causing a cascading series of failures, greatly increasing the amount of damage caused by the storm.
There are 10, to 20, unregulated small dams in the state according to the state. They pose an enormous risk as the flooding clearly demonstrated but SC isn't alone in sharing this burden. Accounting for failure frequency due to natural disasters occurs at the design initial or retrofit stage, not the maintenance stage.
Should every mom-and-pop dam adhere to the once-in-ten-thousand-year-rule eg: nuclear powerplants or once-every-hundred-years eg: steel framed commercial construction? Cost effectiveness is also a huge concern. Note that maintenance doesn't increase the expected failure frequency, it maintains it at the design spec. And I'm willing to bet that even with proper maintenance those small dams in SC would not have survived; they were way outside their designed specs. I drive past Folsom dam every day and have watched the incremental maintenance as well as a few large scale projects progress first hand.
One of the most amazing things to witness was the construction of the spillway they have been building around the outer perimeter.
They essentially are creating a second dam around the main dam to release water from a lower point due to a scare many years ago. Months of sorting dirt and rock at some kind of large facility nearby and a good year of constant trucks moving the dirt down the road. Even the asphalt on the road began to sink from the constant pressure of the heavy loads. How long a dam lasts and how long the reservoir behind it is usable are two different things. In fact, one of the reasons the latter dam was constructed was to act as a catch basin so the downstream Lake Mead behind Hoover dam wouldn't fill so quickly.
WildUtah on Dec 21, parent next [—]. Sediment loads aren't really a problem. The sediment drops out as soon as the water goes slack so it all accumulates at the far upstream section of the reservoir and raises the river level rather than filling in much capacity. The Grand Canyon is filling in with Hoover Dam sediment while the reservoir remains unfilled. In fact, the Grand Canyon is now a mud lagoon starting above Separation Canyon and the water below Pearce Ferry has very little sediment.
The upstream sediment slackwater continues to migrate upcanyon, not downcanyon. On Glen Canyon, the sediment accumulated 40 meters deep over Hite but did not slip downcanyon.
Instead, Cataract Canyon continues to fill in upstream.
0コメント